Engineering a Mainline Pump Package with Hydraulic Modification

This Ingersoll Rand 6×13 DA-8/6 Pump Package with a Toshiba 3500 HP Electric Motor is designed as a mainline pipeline pump in gasoline service for a well-known major pipeline company and PZE built an identical pump to serve as a backup spare. This mainline pump package was designed and built with extensive hydraulic modifications and the BEP was shifted right on the curve […]

Offshore Oilwell SA-634 Helicopter Pump Unit

The latest diesel driven pump package designed by Power Zone Equipment incorporated the customer’s own pump. The Oilwell SA-634 was sent to PZE from Nigeria and had significant power end and fluid end damage.

Pipeline Pumping System for Midstream Crude Oil Pipeline

Every year brings new projects, new customers, and interesting challenges for the team here at Power Zone. Like many companies, we are always looking to expand our knowledge and deliver more efficiently for each client that we serve.

Emergency Dewatering Pump in West Africa

On an ordinary Tuesday morning we received a call from a gold mine in West Africa saying “our pumps are down, our mine is flooding, and we need help fast.”

Mobile Booster Pump Station

The pump package shown here was designed for a hydraulic fracturing water supply application which needed up to 55,000 BPD (1,604 GPM).

Gardner Denver PZ-9 Pump Package | UEA Project

The Gardner Denver PZ-9 Pump package came to Power Zone from Texas and ultimately ended up in Australia. Eventually called the UEA Project, the package required rebuilding of the pump and diesel engine, modification to the skid, refinishing of all equipment and structures, and the addition of hydraulic jacks.

Well Blow Down Unit (BDU)

The Multi-Phase Blow Down Unit or BDU was first designed in 2012 by Power Zone Equipment and was the first unit of its kind for Gas Well Deliquification.

Aplex MA-95M Rush Order

Power Zone was contacted with an immediate need for a positive displacement pump. The pump that the company had been using went out of service. The Aplex MA-95M was a perfect replacement, but was in used condition as an individual inventory item. When the P.O. was received on Monday, the Power Zone team immediately jumped […]

Cookies & Privacy

By clicking “Accept All Cookies” you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.